Evidence item
The abstract directly reports 223 feasible cases, 197 numerically accepted cases, and an 88.3% conditional acceptance rate among 294 cases. DIRECT_TEXT
Source: A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment · locator {} · excerpt hash sha256:984ee8b32ebe354eadc967d756b88b807bf12a801268cb4c9bf6014d790c03cc
Exact excerpt
Of 294 structured cases, 223 are analytically feasible and 197 satisfy the numerical acceptance criteria, yielding an 88.3% conditional acceptance rate.
Linked claims
| Claim | Direction | Relevance | Steps | Counted |
|---|---|---|---|---|
| 96af3ed5 | SUPPORT | DIRECT | 0 | yes |
Audits
None.