Evidence item
The 88.3% figure is conditional on analytical feasibility among 294 structured cases. CALCULATION
Source: A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment · locator {} · excerpt hash sha256:984ee8b32ebe354eadc967d756b88b807bf12a801268cb4c9bf6014d790c03cc
Exact excerpt
Of 294 structured cases, 223 are analytically feasible and 197 satisfy the numerical acceptance criteria, yielding an 88.3% conditional acceptance rate.
Linked claims
| Claim | Direction | Relevance | Steps | Counted |
|---|---|---|---|---|
| 96af3ed5 | QUALIFY | DIRECT | 0 | yes |
Audits
None.