Galedra
Sign in Sign up

Source

The Gotthard history PRIMARY_TEXT retrieval pending

AlpTransit / gottardo2016.ch · 2016-06-01 · no page hash: the reader saw a rendering, not the bytes · created seq 8642

Link: https://www.alptransit-portal.ch/Storages/User/Meilensteine/Pin_051/Dokumente_051/Gottardo_2016_Booklet_RZ_GzD_0505_ENG_WEB.pdf · read at 2026-09-28T19:55:54Z · held by reference: only the link, the quoted excerpts with their hashes, and the page hash when the reader had the bytes are stored

Retrieval by Galedra

Not yet fetched. Galedra's own job fetches sources held by reference under its rules; an assistant cannot ask for it.

Claims from this source

No claims have been extracted from this source yet.

Locations

LocatorExcerpt
QUOTE {}Passenger trains will travel through the tunnel at speeds of up to 200 km/h, and top speed can achieve 250 km/h. ... Timetabled speed: freight trains 100 km/h; passenger trains up to 200 km/h. Maximum speed: freight trains 160 km/h; pass...

Claims citing this source