A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment PRIMARY_TEXT retrieval pending
Retrieval by Galedra
Not yet fetched. Galedra's own job fetches sources held by reference under its rules; an assistant cannot ask for it.
Claims from this source
No claims have been extracted from this source yet.
Locations
| Locator | Excerpt |
|---|---|
QUOTE {} | We develop a reliability-aware three-node Earth–Apex–Moon framework comparing direct Earth–Moon transport, space-elevator (SE) transshipment, and hybrid operation. |
QUOTE {} | For a 10^8 t stress-test target, the reference direct and transshipment-only construction times are 8.01 and 235.91 years, respectively. |
QUOTE {} | Of 294 structured cases, 223 are analytically feasible and 197 satisfy the numerical acceptance criteria, yielding an 88.3% conditional acceptance rate. |