A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment PRIMARY_TEXT retrieval pending

Scientific Reports · 2026-09-16 · no page hash: the reader saw a rendering, not the bytes · created seq 25581

Link: https://www.nature.com/articles/s41598-026-70408-6 · read at 2026-09-29T05:21:00Z · held by reference: only the link, the quoted excerpts with their hashes, and the page hash when the reader had the bytes are stored

Retrieval by Galedra

Not yet fetched. Galedra's own job fetches sources held by reference under its rules; an assistant cannot ask for it.

Claims from this source

No claims have been extracted from this source yet.

Locations

LocatorExcerpt
QUOTE {}We develop a reliability-aware three-node Earth–Apex–Moon framework comparing direct Earth–Moon transport, space-elevator (SE) transshipment, and hybrid operation.
QUOTE {}For a 10^8 t stress-test target, the reference direct and transshipment-only construction times are 8.01 and 235.91 years, respectively.
QUOTE {}Of 294 structured cases, 223 are analytically feasible and 197 satisfy the numerical acceptance criteria, yielding an 88.3% conditional acceptance rate.