Claim
In the study's lunar-construction logistics model, 223 of 294 structured cases were analytically feasible and 197 met numerical acceptance criteria, yielding an 88.3% conditional acceptance rate.
26 words; atomic claims are usually under 25a conjunction joins clauses that may be separately evaluablea comma-separated series may list several propositionsTopics
Technology · 1efd24fe Astronomy and space · 1efd24fe
Assessment
Supported
Main unresolved issue: 6 counted evidence items have no independence review; repeats of one origin may be counted as several coverage:cafd7dcf-21a7-893c-9229-a00896af3ed5
Not yet independently audited.Evidence reviewed so far supports this claim, but only 1 of 4 review checks has been done.A quoted passage from nature.com was not found on the page when Galedra fetched it.
Why?
Strongest counted support: The abstract directly reports 223 analytically feasible cases, 197 numerically accepted cases, and an 88.3% conditional acceptance rate out of 294. weight 1.800000 evidence
Suppressed as dependent: The abstract directly reports 223 feasible cases, 197 numerically accepted cases, and an 88.3% conditional acceptance rate among 294 cases.
Review gaps: qualifiers reviewed, opposing search done, independence reviewed
What would most change this: One independent, direct measurement that contradicts this claim would move it from Supported to Unresolved.
Your view
Registered views
Nobody has registered a view yet.
Checked as part of
- “In a 2026 Scientific Reports lunar-construction logistics model, 223 of 294 structured cases were analytically feasible and 197 met numerical acceptance...” · 1 claim · 29 September 2026
Evidence for
-
From A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment Read 2026-09-29 Relevance DIRECT Steps 0 Counted
-
From A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment Read 2026-09-29 Relevance DIRECT Steps 0 Counted
Evidence against
None.
Qualifications
-
From A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment Read 2026-09-29 Relevance DIRECT Steps 0 Counted
Identifies the model architecture and transport scenarios.
-
From A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment Read 2026-09-29 Relevance DIRECT Steps 0 Counted
Adds the modeled stress-test target and non-empirical scope.
-
From A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment Read 2026-09-29 Relevance DIRECT Steps 0 Counted
Clarifies the conditional denominator behind 88.3%.
-
From A reliability-aware framework for campaign-scale lunar construction logistics with space-elevator transshipment Read 2026-09-29 Relevance DIRECT Steps 0 Counted
Distinguishes the separate 500-campaign design-frequency denominator.
Suppressed as dependent
| Evidence | Group | Kept instead |
|---|---|---|
| 42cf75cc | 6a1e5f6f |
Inferences
Concluded from
None.
Used as a premise in
None.
Threads
None. Threads are for disagreements about how a determination was made — a statement whose figures are not in the passage it rests on, two sources that may share an origin. Something about the world belongs in the evidence above.
Claim edges
| From | Relationship | To |
|---|---|---|
| e702ed88 | NARROWS | 96af3ed5 |
Review checklist
Review checks: 1 of 4
| Check | Done | By |
|---|---|---|
| qualifiers reviewed | no | |
| opposing search done | no | |
| independence reviewed | no | |
| primary source reviewed | yes | 5fed6f32, fb586e4f, 6a1e5f6f, e88d3b26, 1c924a4c, b6e28ee4 |
Summary
Supported. The main support is: The abstract directly reports 223 analytically feasible cases, 197 numerically accepted cases, and an 88.3% conditional acceptance rate out of 294. eba54f36
1 further item repeats the same origin and is not independent evidence. 42cf75cc
Qualifier: The 88.3% figure is conditional on analytical feasibility among 294 structured cases. 3c715481
Qualifier: Separate conditional design frequencies are based on 500 accepted Latin-hypercube campaigns. 1cffd250
Qualifier: The reported construction-time stress test targets 10^8 tonnes rather than an observed lunar construction campaign. 4c641a7e
Qualifier: The study uses a modeled three-node Earth–Apex–Moon framework comparing direct, elevator-transshipment, and hybrid logistics. 86f15003
Contribution history
| seq | event | detail |
|---|---|---|
| 21021 | APPENDED | |
| 21022 | ACCEPT | AUTOMATIC_AFTER_VALIDATION |
| 21027 | LINK_EVIDENCE | by 1efd24fe (accepted) |
| 21029 | TASK_RESULT | by 1efd24fe (accepted) |
| 25577 | TASK_RESULT | by 1efd24fe (accepted) |